Open Source Leg
Menu

Knee Assembly Step 3

Adding the Timing Belt

Instructions

1

Place the timing belt around the output and input pulleys, making sure the teeth are aligned.

2

Place the input pulley flange on the end of the input pulley with the ridge facing away from the input pulley.

3

Place the small bearing (5972K82_Ball Bearing) on the end of the input pulley.

4

Place the iglide bearing on the end of the linear shaft.

5

Place the large bearing (6656K11_Ultra-Thin Ball Bearing) on the outside of the large hole on the left knee housing. Make sure that the arrows are facing up.

6

Fasten the left knee housing and right knee housings together using the 3 screws and 2.5 mm Allen wrench.